Reverse a syncovery overwrite6/18/2023 For example, if you shared an editable feature layer in a collaboration 100 days ago, and edits from that collaboration have not been synchronized, you can trim records older than 180 days, but do not trim records older than 30 or 90 days. Any changes made or versions taken offline or shared in a collaboration that are older than the number of days you specify will be removed.ĭo not trim the change log if you have unsynchronized collaborations or offline edits that were shared in a collaboration or taken offline during the time period that will be trimmed from the table. To avoid credit charges associated with a large change log, you can trim it.įor each feature layer that has either of these options enabled, you can specify a number of days' worth of changes to retain. This change log grows as changes continue to accumulate. When you enable the options Enable Sync (required for offline use and collaboration) or Keep track of changes to the data (add, update, delete features) on your hosted feature layer, ArcGIS Online stores information about data changes and offline versions in a change log. There are two edit settings that use a change log that you can manage by trimming older entries, as described below. See Manage hosted feature layer editing for information about all the settings and factors that affect who can edit a hosted feature layer.
0 Comments
Leave a Reply. |